No. The Stormwater Pollution Prevention Control Plan (SWWP) prepared for the project will prevent stormwater runoff pollution from the Medline site both during construction and operation and will improve the current site condition where no storm water control is in place.
The SWPP for the site provides a very conservative plan for stormwater treatment which implements multiple levels of treatment of stormwater runoff during construction and operation. The plan will incorporate additional stormwater protection measures being developed by the Town for large industrial projects including the provision of additional measures to address sedimentation concerns associated with very fine soils on the Medline site.